Deer Valley Water Treatment Plant Phoenix Az
Demolition of existing 20 inch well piping.
Deer valley water treatment plant phoenix az. Highdesert community watch news network 63 774 views. If you are interested in a tour send us an email to conservation phoenix gov. 1 local area photos around deer valley water treatment plant 2 a listing of the nearest hotels to deer valley water treatment plant and 3 driving directions to deer valley water treatment plant from almost anywhere. Deer valley water treatment plant.
Deer valley water treatment plant is a cultural feature locale in maricopa county. Deer valley water treatment plant. Partial demolition of the existing asphaltic plank liner. Given the covid 19 pandemic call ahead to verify hours and remember to practice social distancing.
Removal repainting of sack finish from the exterior ringwall. Wilson engineers was selected to design a new 100 mgd capacity water treatment facility to replace the existing treatment basins. The primary coordinates for deer valley water treatment plant places it within the az 85051 zip code delivery area. After several years of investigation of the existing basins at the deer valley wtp the city of phoenix determined to demolish the existing treatment facilities at this facility due to poor soil conditions.
Removal replacement of the existing metal roofing system. Water treatment plant yorba linda ca securitas security not happy 1st amendment audit duration. Deer valley water treatment plant phoenix ariz the scope of work included demolition of the existing hopper bottom metal roofed reservoir the construction of a new 20 mg cast in place reservoir installation of chemical feed piping level sensors transmitters and associated conduits and control wiring. The scope of work for the deer valley water treatment plant reservoir rehabilitation included the following.
And wetland restoration br p p reclaimed water is pumped from the 91st avenue wastewater treatment plant over to the tres rios wetlands rehabilitating nearly 700 acres in and around the salt river. Tours are available to groups greater than 10 and less than 30 on the third and fourth thursday of the month from september through may. Ames performed structural demolition and replaced the east plant. In the maps and aerial photos section below you ll find links to.
The water treatment plant produces 25 more water than the previous plant and is able to produce more water on a smaller footprint using less energy than before. Installation of a new 2 part lining system. Deer valley water treatment this three phased water treatment plant project included both a civil and mechanical package and required the work to be conducted within an operating facility with minimal scheduled outages during construction.